Vellora Heights Design and Finishes Checklist: What Must Appear in the Sale Agreement

A contract-focused checklist for Vellora Heights buyers covering finish schedules, kitchens, bathrooms, ventilation, electrical systems, snagging and change.
Roadway and office towers in Nairobi in 2025, contextual city image

Editorial disclosure: Nommadj’s author has a professional relationship with Gazebo Homes Ltd. This report distinguishes public developer marketing from independently checked information. Information reviewed 23 November 2026; all project-specific prices, documents and deadlines require reconfirmation before publication.

An off-plan apartment may look complete in a rendering long before the buyer can examine the kitchen, waterproofing, ventilation or electrical installation. For Vellora Heights in South C, the strongest way to manage this uncertainty is to specify exactly what is being bought and how it will be inspected. Adjectives such as ‘premium’, ‘luxurious’ and ‘modern’ are not measurable construction standards.

Editorial review: 23 November 2026. Vellora’s final, approved dimensioned floor plans, full materials schedule, MEP specification and handover/defects procedure were not independently established in the materials reviewed. The items below are questions for the developer and buyer’s independent technical adviser, not claims about existing Vellora amenities or finishes.

Build the agreement around a measurable finish schedule

ElementSpecific written information to obtainTypical inspection focus
Floor areasNet internal area, saleable area, plan revisionMeasured dimensions and deviations
FloorsMaterial type, grade, slip resistance, sampleLevelness, chips, joints
KitchenCabinet substrate, hardware, counter type, appliance inclusionsAlignment, hinges, plumbing
BathroomsFixture brands or standard, tanking, extract/ventilationLeaks, drainage and sealing
Windows and doorsFrame, glazing, opening type, locksFit, drafts, water ingress
ElectricalDistribution, sockets, circuits, backup coverageSafety and usability
PlumbingWater pressure, tanks, pumps and hot-water scopeFlow, leakage, drainage
Common areasLifts, fire systems, access, parking and security scopeCertification and commissioning

A finish schedule should be annexed to the sale contract and refer to a specific revision of the drawing. If the developer wishes to substitute a brand or material, the agreement should require a process for approval and an objectively comparable standard. A promise of ‘equivalent quality’ with no defined benchmark is hard to evaluate.

Floor plans: measure what you intend to live in

Ask for signed drawings with dimensions, door swings, windows, storage and plumbing fixtures. Compare gross or saleable-area marketing figures with the net usable spaces; quantify what has been included in each definition. Check room proportions with actual furniture dimensions and confirm whether balconies, parking, corridors or shared amenities have been counted in advertised area. A higher nominal area is not always more functional.

Do not import layout assumptions from Gazebo Apartments in Parklands. Vellora’s two- and three-bedroom configurations require their own approved plans and schedules.

Roadway and office towers in Nairobi in 2025, contextual city image
Image: Omar David Sandoval Sida, Wikimedia Commons · CC BY-SA 4.0. Unmodified; City roadway image; not a photograph of the Vellora property.

The licensed Nairobi city photo is illustrative; it does not depict Vellora finishes, a show apartment or its construction site.

Kitchens: clarify what is included in the price

A kitchen schedule should list the countertop material and edge treatment, cabinet finishes, hinges and runners, sink, tap, lighting, water and power positions, extractor provision and whether cooker, hob, hood or other appliances are included. Confirm the allocated dimensions for a refrigerator and washing machine. If an electrical appliance is included, request a model or objective minimum specification rather than an unqualified reference to a ‘modern appliance’.

Bathrooms: technical performance before decorative tiles

Bathroom quality depends heavily on waterproofing and ventilation. Ask about wet-area tanking, floor gradients, shower enclosures, sanitary fittings, hot-water production and access to concealed plumbing for repairs. A documented water test and defect-correction process can be more valuable than an expensive tile pattern. Ask how water ingress affecting the unit below will be dealt with after handover.

Common facilities and essential building systems

Buyers should know exactly what the service charge will maintain. Request information about lifts, generator or backup power, firefighting and detection systems, controlled access, water storage, sewer/drainage, waste management and emergency lighting. This article does not assert that Vellora has a pool, gym, rooftop terrace, sauna, DSQ or other specific amenity. Only approved project documents and signed schedules can establish those inclusions.

Ask which facilities must be commissioned before occupation, who verifies them and how operational manuals and warranties will be handed to the owners’ management structure.

Variations and buyer upgrades

If buyers can customise tile colours, kitchen cabinetry or electrical sockets, the agreement should state the deadline for requesting changes, the approval authority, the incremental price, the effect on warranties and whether the change alters the completion date. Keep signed variation orders in one register. Verbal assurances that ‘we can change that later’ are unreliable if the relevant installation is already underway.

Conduct a structured pre-handover snagging inspection

Before signing an unconditional handover acknowledgment, arrange a walkthrough with a competent inspector. Record each defect with a dated photograph, location and description; group issues by safety, water ingress, operation and cosmetics. Test doors, windows, electrical fittings, tap flow, drain performance and appliance operation where safe and authorised. Note outstanding common facilities separately from defects within the unit.

Handover documentReason to request it
Signed as-built or final unit planWhat was actually delivered
Agreed finish schedule and approved changesObjective comparison against contract
Snagging list with completion datesTraceable correction obligations
Equipment manuals and warrantiesMaintenance and claims
Relevant occupancy/commissioning recordsBuilding safety and usability checks
Keys, access credentials and utility readingsPractical transfer into use

FAQ

Is a sample show unit legally binding?

Not automatically. The contract should identify which items demonstrated in a show unit are included in the purchased unit.

Can the developer substitute a finish without consent?

That depends on the agreement. Ask your advocate to negotiate clear variation standards and consent rules.

What happens if defects are found after moving in?

The contract should set out the defects-liability or warranty period, notice method and repair obligations. Preserve evidence and follow the documented claim process.

Read the Vellora two- versus three-bedroom guide for layout selection and the due-diligence checklist for legal and construction documentation.

Quality principle: Buy a documentable specification and a workable remedy, not an untestable marketing adjective.

Featured image attribution: Image: Omar David Sandoval Sida, Wikimedia Commons · CC BY-SA 4.0. Unmodified; City roadway image; not a photograph of the Vellora property.

Sources and further verification

This article is general information, not a substitute for an independent Kenyan lawyer, valuer, engineer or financial adviser. Dated estimates and mathematical examples are not binding Vellora Heights terms or guaranteed returns.

Previous Article

Gazebo Homes Track Record: What Gazebo Apartments Can Tell Buyers About Vellora Heights

Next Article

Gazebo Apartments Parklands: Buyer Decision Guide for 2026

Subscribe to our Newsletter

Subscribe to our email newsletter to get the latest posts delivered right to your email.
Pure inspiration, zero spam ✨